- Home » Editorial » Hydraulics
Enerpac hydraulic cylinder lifting accuracy enables Pioneering Spirit fast lift
Enerpac has supplied the high pressure, hydraulic cylinder technology for the topsides lift system beams on Allseas ‘Pioneering Spirit’ vessel. The cylinders are an integral part of the vessel’s lift system, enabling the installation and decommissioning of complete topsides weighing up to 48,000 tonnes.
‘Pioneering Spirit’ is claimed to be the world’s largest platform installation/decommissioning and pipelay vessel. The vessel’s 16 lifting beams feature 64 Enerpac CLRG-Series high tonnage double acting hydraulic cylinders arranged in groups of four. Designed specifically for heavy lifting up to 1000 tonnes, the cylinders were delivered within three months of Enerpac signing the contract with Allseas.
The Enerpac double-acting cylinders provide very high levels of precision and control; essential factors in successful heavy lifting. This level of lifting accuracy enables the ‘Pioneering Spirit’ to use the fast lift method. During installation and decommissioning, the lifting beams are extended allowing platform topsides to be lifted several metres.
These special 1000 tonne cylinders were designed by Enerpac’s engineering team near Madrid, Spain, and produced in Hengelo, The Netherlands.
High corrosion resistance
To ensure trouble-free operation offshore for many years, the Enerpac hydraulic cylinders have higher than normal levels of corrosion resistance. For example, the parts were first subjected to NiCr80/20 plasma spray, then with an AlTi plasma spray. Two layers of special coating to close the pores of the steel followed this. The final baked enamel finish and plated pistons for each cylinder are compliant with the NORSOK M-501 standard for surface preparation and protective coating.
“Precision and control are built into everything we make,” said Jeroen Naalden, global director, Enerpac Integrated Solutions. “Enerpac’s 1000 tonne hydraulic cylinders will provide ‘Pioneering Spirit ‘, with the heavy lift capability needed for the successful offshore installation and decommissioning of complete topsides.”
-
LAMMA Show 2025
15 January, 2025, 8:30 - 16 January, 2025, 16:30
NEC, Birmingham UK -
SOUTHERN MANUFACTURING & ELECTRONICS SHOW 2025
04 February, 2025, 9:30 - 06 February, 2025, 15:30
Farnborough International Exhibition Centre, off Aerospace Boulevard, Farnborough GU14 6TQ -
SMART Manufacturing & Engineering Week
04 - 05 June, 2025
NEC, Birmingham UK -
PPMA 2025
23 September, 2025, 9:30 - 25 September, 2025, 16:00
NEC, Birmingham UK